I managed a second day of work on the TVR chassis which largely consisted of find a rusty bit, cut it out, weld in a new bit, move on to the next rusty bit!
Left hand diagonal support offered up |
And right hand too!
New rear cross member and supporting tubes are held in place with bungees prior to tack welding
Freshly welded!
Clean and shiny!!!
Close-up...not the best welding in the world but I think it will do...
Rear cross-member welded in place
The next chunk I've cut out....gulp!
I'm going to have to order some more 1.5" tubing, I've nearly used all of the 6 metres I originally bought! Will also need to purchase some of the smaller diameter tubing to replace the cut away triangulation struts.
I'm going to have to order some more 1.5" tubing, I've nearly used all of the 6 metres I originally bought! Will also need to purchase some of the smaller diameter tubing to replace the cut away triangulation struts.
All in all another very productive day's work!! Both cross-members were carefully levelled before final welding.....lots of measuring, checking and re-checking...